Natural Power Offices

Natural Power Offices

Floor Area:360m2
Complete: 2001

NSA was commissioned to build a comfortable, healthy and bright office. The facility accommodates up to 18 workers, and is based on a hot desking design for complete flexibility. Timber was selected from the client’s forest, cut using a portable sawmill and air-dried on location around 16 weeks before construction started.

The building is completely free of external infrastructure support using local hydropower, ground water from a bore hole and draining to a septic tank.


Further information can be found in this A+DS SUST Case Study